Roberts Gorden Combat 150 Service Manual

Browse online or download Service Manual for Water heaters & boilers Roberts Gorden Combat 150. Roberts Gorden Combat 150 Service manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 62
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
WARNING
FOR YOUR SAFETY
If you smell gas:
1. Open windows.
2. DO NOT try to light any appliance.
3. DO NOT use electrical switches.
4. DO NOT use any telephone in
your building.
5. Leave the building.
6. Immediately call your local gas
supplier after leaving the building.
Follow the gas suppliers
instructions.
7. If you cannot reach your gas
supplier, call the Fire Department.
Fire Hazard
Do not store or use petrol or other
flammable vapours and liquids in the
vicinity of this or any other appliance.
Some objects will catch fire or explode
when placed close to heater.
Failure to follow these instructions can
result in death, injury or property
damage.
Roberts-Gordon Europe Limited
Unit A, Kings Hill Business Park
Darlaston Road, Wednesbury
West Midlands,WS10 7SH UK
Telephone: +44 (0)121 506 7700
Fax: +44 (0)121 506 7701
Service Telephone: +44 (0)121 506 7709
Service Fax: +44 (0)121 506 7702
E-mail: uksale[email protected]m
WARNING
Installation must be done by a registered installer/
contractor qualified in the installation and service of
gas/oil-fired heating equipment or your fuel supplier.
Improper installation, adjustment, alteration, service
or maintenance can result in death, injury or property
damage. Read the installation, operation and service
manual thoroughly before installing or servicing
this equipment.
Installer
Please take the time to read and understand
these instructions prior to any installation.
Installer must give a copy of this manual to the owner.
Owner
Keep this manual in a safe place in order to provide
your serviceman with necessary information.
© Copyright 2008 Roberts-Gordon LLC
Quality in Any Language™
Combat
®
Installation, Commissioning,
Operation & Service Manual
OIL-FIRED:
Model POP-ECA
015 to 0100
GAS-FIRED:
Model PGP-ECA
015 to 0100
P/N X523 Rev G 10/08
Cabinet Heaters
Page view 0
1 2 3 4 5 6 ... 61 62

Summary of Contents

Page 1 - Cabinet Heaters

WARNINGFOR YOUR SAFETYIf you smell gas:1. Open windows.2. DO NOT try to light any appliance.3. DO NOT use electrical switches.4. DO NOT use any teleph

Page 2

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL4 Figure 1: Installation Clearances and Clearances to CombustiblesWAR

Page 3 - Roberts-Gordon LLC

SECTION 4: SPECIFICATIONS5SECTION 4: SPECIFICATIONS4.1 PGP & POP Internal HeatersDimension Data - PGP & POP Internal HeatersNOTES: Horizontal

Page 4

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL6 4.2 PGP & POP External HeatersDimension Data - PGP & POP Ex

Page 5 - TABLE OF FIGURES

SECTION 4: SPECIFICATIONS74.3 Air Outlet and Flue Arrangements4.3.1 Vertical and Horizontal Heaters - Free Blowing (top view)NOTE: Models 015-020 are

Page 6

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL8 4.4 General Technical Data Table (all models)Appliance Category II

Page 7 - Product Approval

SECTION 4: SPECIFICATIONS94.6 Technical Data - Ecoflam Modulating Burners (all models - burner reference "H")NOTE: The air setting is a guid

Page 8

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL10 4.7 Technical Data - Ecoflam Oil-Fired Burners (burner reference &

Page 9 - RITICAL CONSIDERATIONS

SECTION 5: HEATER INSTALLATION11SECTION 5: HEATER INSTALLATION5.1 General Heaters are designed for floor standing vertical installation. Special versi

Page 10 - *.6 m *.6 m

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL12 Figure 3: Typical Installation of a Oil-Fired Cabinet Heater1 mMin

Page 11 - SECTION 4: SPECIFICATIONS

SECTION 6: FLUE INSTALLATION13SECTION 6: FLUE INSTALLATION6.1 Flue InstallationFlues must be correctly sized for the model. See Page 5, Section 4.1. F

Page 13 - Outlet Spigot Dimensions

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL14 Figure 6: Guy WireFigure 7: Socket DirectionFigure 8: Flue and Roo

Page 14 - Appliance Category II

SECTION 7: AIR SUPPLY15SECTION 7: AIR SUPPLY7.1 Air SupplyIt is important to ensure adequate air supply at all times for both combustion and heating r

Page 15

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL16 SECTION 8: FUEL PIPINGIt is important that the gas supply pipe and

Page 16 - Kerosene Data

SECTION 8: FUEL PIPING178.2 Fuel Oil Supply8.2.1 Fuel Storage TankThe fuel storage tank should be located outside the building as close as possible to

Page 17 - EATER INSTALLATION

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL18 Figure 12: Pressurised System Installation - Duplex SystemCheckVal

Page 18

SECTION 9: WIRING AND ELECTRICAL INFORMATION19SECTION 9: WIRING AND ELECTRICAL INFORMATION9.1 Electrical SupplyA 230 V 50 Hz 1 Ø supply is required fo

Page 19 - Minimum Total

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL20 2. The control will then adjust the burner input continuously to a

Page 20

SECTION 9: WIRING AND ELECTRICAL INFORMATION219.4 CCH Wiring Diagram Oil Models 15-30 (floor standing)Note: Remote fan controlcarries full load of fan

Page 21 - IR SUPPLY

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL22 9.5 CCH Wiring Diagram Gas Models 15-30 (horizontal mounting)Red12

Page 22 - Fire Hazard

SECTION 9: WIRING AND ELECTRICAL INFORMATION239.6 CCH Wiring Diagram Oil Models 15-30 (horizontal mounting)Red1234N10 AMAIN TERMINALSIN CONTROL PANELB

Page 23 - UEL PIPING

© 2008 Roberts-Gordon LLCAll rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any

Page 24 - Pump Set

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL24 9.7 CCH Wiring Diagram Gas Models 40-50 (floor standing)Red1234N10

Page 25 - Electrical Shock Hazard

SECTION 9: WIRING AND ELECTRICAL INFORMATION259.8 CCH Wiring Diagram Oil Models 40-50 (floor standing)Red1234N10 AMAINFANMOTORMAIN TERMINALSIN CONTROL

Page 26

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL26 9.9 CCH Wiring Diagram Gas Models 40-50 (horizontal mounting)Red12

Page 27

SECTION 9: WIRING AND ELECTRICAL INFORMATION279.10 CCH Wiring Diagram Oil Models 40-50 (horizontal mounting)NOTE:Any of the original wire supplied wit

Page 28 - GAS BURNER 7-WAY PLUG

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL28 9.11 CCH Wiring Diagram Gas Models 60-100 (floor standing)12310 AT

Page 29 - OIL BURNER 6-WAY PLUG

SECTION 9: WIRING AND ELECTRICAL INFORMATION299.12 CCH Wiring Diagram Oil Models 60-100 (floor standing)12310 ATIME/TEMPERATURECONTROLSFAN CONTROLL1FA

Page 30

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL30 9.13 CCH Wiring Diagram Gas Models 60-100 (horizontal mounting)123

Page 31

SECTION 9: WIRING AND ELECTRICAL INFORMATION319.14 CCH Wiring Diagram Oil Models 60-100 (horizontal mounting)123410 ABlueFANLIMITFAN / LIMIT STAT7827R

Page 32

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL32 9.15 Final Connections to Ecoflam HIGH/LOW or Modulating Burners (

Page 33

SECTION 10: COMMISSIONING33SECTION 10: COMMISSIONINGInstallation, service, commissioning and annual inspection of the heater must be done by a contrac

Page 35

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL34 Figure 13: Combination Thermostat (all models)10.2 Commissioning t

Page 36

SECTION 10: COMMISSIONING353. Check gas flow rate at gas meter.10.3 Control - Gas-Fired HeatersFor High/Low and modulating burners, follow the general

Page 37

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL36 Figure 15: Motor Starter (models 040 -100 and Thermal Overload (mo

Page 38

SECTION 10: COMMISSIONING37Figure 17: Dungs Gas Valve10.4 Gas ValvesDungs Combination Gas ValveAll model 015 - 030 gas-fired burners operate as direct

Page 39

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL38 10.5.1 Pressure SwitchSetting of the pressure switch must only be

Page 40

SECTION 10: COMMISSIONING3910.7.2 Sequence of OperationThe operating sequence is as follows:With the external controls on and calling for heat, the bu

Page 41 - SECTION 10: COMMISSIONING

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL40 SECTION 11: USER INSTRUCTIONS11.1 User InstructionsThe COMBAT® Cab

Page 42

SECTION 11: USER INSTRUCTIONS4111.2.2 Burner Lockout Reset ButtonThe red warning light built into the burner control box will illuminate when the cont

Page 43 - OMMISSIONING

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL42 WARNINGFOR YOUR SAFETYIf you smell gas:1. Open windows.2. DO NOT t

Page 44

SECTION 12: SERVICING43SECTION 12: SERVICING12.1 Servicing InstructionsAfter commissioning, the heater will require maintenance to be carried out annu

Page 45

TABLE OF FIGURESFigure 1: Installation Clearances and Clearances to Combustibles ...4Figure

Page 46

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL44 SECTION 13: CONVERSION BETWEEN FUELS13.1 GeneralAll COMBAT® Cabine

Page 47 - SECTION 11: USER INSTRUCTIONS

SECTION 14: TROUBLESHOOTING45SECTION 14: TROUBLESHOOTING14.1 GeneralWARNINGExplosion HazardInstallation must be done by a registered installer/contrac

Page 48

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL46 14.2 Troubleshooting for Oil Burners (see manufacture’s instructio

Page 49 - Cut Hazard

SECTION 14: TROUBLESHOOTING4714.3 Troubleshooting for Gas Burners (see manufacturer’s instructions)Heater OperatingTROUBLESHOOT ENDS.If problems persi

Page 50

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL48 14.4 Troubleshooting for Flame Supervision SystemHeater OperatingT

Page 51 - SECTION 14: TROUBLESHOOTING

14.5 Troubleshooting for Solenoid Valves Circuit14.6 Troubleshooting for Main Fan Circuit (1 Ø)Fault lies elsewhere.Investigate and correct.Valve faul

Page 52

14.7 Troubleshooting for Main Fan (3 Ø)Motor running.TROUBLESHOOT ENDS.If problems persist, contactROBERTS GORDON® atTel: +44 (0)121 506 7709www.rg-in

Page 53

SECTION 15: REMOVAL AND REPLACEMENT PARTS51SECTION 15: REMOVAL AND REPLACEMENT PARTSSee warnings and notes on Page 43, Section 12 before removing or r

Page 54

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL52 5. Check the correct rotation of the fan as on Page 33, Section 10

Page 55 - replacement parts

SECTION 16: PARTS LIST53SECTION 16: PARTS LISTThe following items are recommended as spares which may be required during routine service and replaceme

Page 59 - ARTS LIST

WARNING© 2007 Roberts-Gordon, LLC www.rg-inc.com

Page 60

1 Product ApprovalROBERTS GORDON® appliances have been tested and CE certified as complying with the essential requirements of the Gas Appliance Direc

Page 61

COMBAT® CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL2 SECTION 1: HEATER SAFETYYour Safety Is Important to Us!This symbol

Page 62 - Installation Clearances

SECTION 3: CRITICAL CONSIDERATIONS3SECTION 3: CRITICAL CONSIDERATIONS3.1 Basic InformationCabinet heaters are supplied with burners suitable for on/of

Comments to this Manuals

No comments